Every Job Over WaterStarts With the Paperwork.

Dredging and marine construction run on the Army Corps safety manual, OSHA over-water rules and permits with their own deadlines. X3 Marine Construction keeps the accident prevention plan, every activity hazard analysis, the crane and skiff checks and the permits in date for every project.

  • Accident prevention plan
  • Activity hazard analyses
  • Over-water checks
  • Floating cranes
  • Permits & notices
What X3 Marine Construction keeps on every record
  • EM 385-1-1USACE safety manual (2024)
  • 29 CFR 1926.106Working over water
  • 29 CFR 1926.1412Crane inspections
  • 29 CFR 1926.1437Floating cranes
  • 29 CFR 1910 Subpart TCommercial diving
  • 33 USC 403Section 10 permits
  • 46 CFR 136Subchapter M tugs
The Exposure

No Accepted Plan, No Notice to Proceed.

On Corps work the accident prevention plan must be accepted before work starts, and every definable feature of work needs an activity hazard analysis (EM 385-1-1). Over water, OSHA requires life jackets, ring buoys no more than 200 feet apart and a skiff standing by (29 CFR 1926.106). Cranes on barges need shift, monthly and annual inspections (29 CFR 1926.1412, 1926.1437).

The government QA rep reads your AHAs. Make sure they are current. X3 puts it on the clock.

An aerial view of bridge construction over a river with a barge below
A crane barge on the water at sunset
X3 Intelligence

One Project. One Safety File. Always Current.

X3 Marine Construction turns each project's plan, hazard analyses, crane inspections, over-water checks and permits into dated items with owners.

Accident prevention plan

Acceptance date, updates and the site safety and health officer for each project.

Activity hazard analyses

Each definable feature of work with its risk level, acceptance and last crew review.

Over-water checks

Life jackets, ring buoys and the rescue skiff checked before work each day (1926.106).

Cranes and floating plant

Shift, monthly and annual crane inspections and operator certification dates (1926.1412).

Diving operations

Dive plans, supervisors and depth logs under OSHA's commercial diving rules.

Permits and notices

Corps permits, water quality certifications and Coast Guard notices with their deadlines.

Stop chasing dates. Start seeing them coming.

Working dashboard

The Project's Safety File, Without the Binder.

A sample project the way X3 Marine Construction shows it: the APP accepted, one AHA due for review, today's over-water check done and the crane's monthly inspection due Friday.

A barge carrying heavy cranes at sea
Pier 9 Rehab · Corps contractSample
Illustrative · your records fill the same view
Accepted
Accident prevention plan
1
AHA due for crew review
Done
Today's over-water check
3 days
Crane monthly inspection
Before tomorrow's shift
  • Review the pile-driving AHA with the night crew (EM 385-1-1)
  • Monthly inspection of crane barge CB-2 due Friday (29 CFR 1926.1412(e))
  • Section 10 permit work window ends Nov 30
  • Ring buoys checked — 90 ft line, ≤200 ft apart (29 CFR 1926.106)

Sample screen. No real records or determinations are shown. Your company starts with an empty workspace.

How the work flows

Add. Load. Write. Check. Track. Close.

Six moves, in the order the work really happens.

  1. 01

    Add the project

    Each job site with its contract.

  2. 02

    Load the plan

    APP acceptance and the SSHO.

  3. 03

    Write the AHAs

    One per definable feature of work.

  4. 04

    Check before work

    Over-water gear and crane checks daily.

  5. 05

    Track permits

    Corps, state and Coast Guard dates.

  6. 06

    Close out clean

    A complete safety file at the end of the job.

Every item gets an owner and a date. Every date gets proof.

The X3 Marine Construction dashboard on a tablet, showing a sample project's readiness score and next actions
Where X3 Marine Construction Fits

One Maritime Loop. X3 Marine Construction Owns the “Work” Step.

Thirteen products, six steps, one job each. Your plan includes all thirteen. Start with X3 Marine Construction and turn on the step on either side when that job matters.

  1. 01

    People

    Is every person fit, tested and qualified for the job?X3 CrewX3 Marine Testing
  2. 02

    Vessels

    Is every vessel in date with its certificate, surveys and drills?X3 TowingX3 VesselX3 FishingX3 Charter
  3. 03

    Work

    Is the work in the yard and on the terminal under control?X3 ShipyardX3 TerminalsX3 MarinaX3 Marine Construction
  4. 04

    Protect

    Is the port protected from threats and spills?X3 Port SecurityX3 Spill Response
  5. 05

    Respond

    When something happens, is it reported on time and learned from?X3 Casualty
  6. 06

    Command

    What needs a leader today?AI Safety Director
Your Part

X3 Keeps the File. Your SSHO and the Contracting Officer Decide.

X3 Marine Construction organizes what EM 385-1-1, OSHA and your permits require. Plan acceptance, stop-work decisions and permit conditions belong to the people and agencies named in your contract.

A dredge working at a marina in Connecticut at dusk

Government accepts

The contracting officer's representative accepts the APP and AHAs.

SSHO leads

Your site safety and health officer runs safety on site.

Competent persons

Crane, dive and excavation checks by qualified people.

Tugs and towboats

Subchapter M towing vessels use X3 Towing.

A tug pushing a construction barge along the coast
The Outcome

Start On Time. Work Safe. Close Out Clean.

An operation that runs X3 Marine Construction sees every deadline early and proves every one.

Plan accepted.

APP and AHAs ready before the notice to proceed.

Checks done daily.

Over-water and crane checks on the phone.

Permits in date.

No surprise deadlines.

Inspection Day

Built for the Day Someone Asks to See It.

Hand your TPO a login, not a binder.

Give surveyors, auditors, charterers and port captains read-only access. They see every record, certificate and signature — and can't change a thing.

The inspection packet, in one click.

Every certificate, drill, survey, deficiency and crew credential for a vessel or site, printed in order with the rule beside each date.

Know before they do.

A readiness score for every vessel and site, the five actions that raise it most, and a Ready to Sail verdict for each boat every morning.

Pricing

One Price. Every Product Included.

X3 Marine Construction and the other twelve — on one plan, with one sign-in and one bill. You pay for the size of your operation, not for a menu. Start with a free 14-day trial, no card needed. Import your spreadsheet, run the 10-minute setup, or let us load your records for you.

$250a month covers your first 3 vessels or sites and 25 people.
+$49a month for each extra vessel or site.
+$3a month for each extra person.

Pay for a year and get 2 months free.

$348 a month — every product included

$3,480 a year (2 months free)

Prices in US dollars. Subscriptions renew each month or year until cancelled. Drug-test collections, lab fees and other third-party services are billed by those providers.

ExampleMonthlyYearly
Tug company5 boats, 25 crew$348 / month$3,480 / year
Ferry operator2 boats, 15 crew$250 / month$2,500 / year
Shipyard1 yard, 120 workers$535 / month$5,350 / year
Marine terminal1 terminal, 60 workers$355 / month$3,550 / year

Help When You Want It

Done-for-you setup
from $499

Send us your spreadsheets, COIs and crew list. We load your vessels, people and dates, and walk your team through it.

Ask about it
Audit-prep package
from $750 per vessel

Before a TPO audit, Coast Guard exam or OSHA visit: your readiness score, a gap list with owners, the inspection packet and a review call.

Ask about it
Consultant & TPO partners
Revenue share

Run your clients in X3 with read-only auditor logins and one place to see every client's readiness.

Ask about it
Straight Answers

Questions Operators Ask About X3 Marine Construction.

Have one that is not here? Ask X3, or write to us and a person will answer.

An aerial view of bridge construction over a river with a barge below
Is this for Corps of Engineers work?
Yes. It follows the EM 385-1-1 (2024) structure — APP, AHAs, SSHO — and works for private marine construction too.
Does it cover our tugs?
Towing vessels under Subchapter M are covered by X3 Towing, which is in the same plan.
Can crews do the daily checks on a phone?
Yes. The over-water and crane checks are one screen each.
Does X3 write the APP?
X3 tracks it. Our done-for-you service can help you get it written around how your company really works.
How is it priced?
One plan includes every X3 Maritime product: $250 a month covers 3 vessels or sites and 25 people, then $49 a month per extra vessel or site and $3 per extra person. Pay for a year and get two months free.
Accident prevention plans, hazard analyses, over-water safety, floating cranes and permits for every job.

Start On Time. Work Safe. Close Out Clean.

Create your account, open X3 Marine Construction and add your first vessel in under five minutes.