A towboat pushing a long tow of loaded barges along a wide river
X3 MaritimeGuide · how to fill it out

X3 Towing,Field by Field.

Every towing vessel, certificate, survey and audit window on one clock.

The rules your operation answers to
  • 46 CFR 136-144Subchapter M towing vessels
  • 46 CFR 199.180Monthly drills
  • 46 CFR 10.301Medical certificates
  • 46 CFR 16.230Random testing — 50%
  • 29 CFR 1915.12Confined & enclosed spaces
  • 29 CFR 1917.50Crane certification
  • 33 CFR 105.220Security drills every 3 months
  • 33 CFR 155.1060Spill response exercises
  • 46 CFR 4.05-10CG-2692 within 5 days
  • 46 CFR 4.06-32-hour / 32-hour test clocks

Every record X3 Towing keeps, the rule behind it, how often it comes due, and exactly what to type in each field — with where to find it on your own paperwork.

Fleet & COI

46 CFR 136 / 137.200 / 137.205 · Once per vessel, update at each survey and COI renewal

Each towing vessel's Certificate of Inspection and compliance option. Without a current COI the boat cannot operate.

FieldWhat it isWhere to find itExample
Compliance optionHow the boat is inspected: through your TSMS and a TPO, or directly by the Coast Guard.If you have a TSMS certificate from a TPO, it's the TSMS option. Your COI paperwork also shows it.TSMS option
COI issuedThe date the current COI was issued.Date of issue on the Certificate of Inspection (COI).06/30/2025
COI expiresThe date the COI runs out. COIs are good for 5 years.Expiration date on the COI.06/30/2030
Last annual inspection / TPO surveyDate of the last annual survey (TPO) or Coast Guard annual inspection.Survey report from your TPO, or the Coast Guard's inspection record or endorsement.06/15/2027
Next survey (only if your TPO set a different date)Only if your TPO set a different date for the next survey.Your TPO's survey report or scheduling letter.05/31/2028

TSMS Audits

46 CFR 138.310 / 138.315 · Internal audit every year; external audits per certificate

Your company's Towing Safety Management System certificate and audits. Under the TSMS option, the TPO audits your system and the Coast Guard checks the certificate.

FieldWhat it isWhere to find itExample
TSMS certificate issuedThe date the TSMS certificate was issued.Issue date on the TSMS certificate from your TPO.03/01/2024
TSMS certificate expiresThe date the TSMS certificate runs out (up to 5 years).Expiry ('valid until') date on the TSMS certificate.03/01/2029
Last internal auditDate of your last internal audit. It's due every year, within 3 months of the certificate anniversary.Internal audit report, signed by an auditor independent of the work audited.02/15/2027
Mid-period external audit doneDate of the mid-period external management audit done by your TPO.TPO's external audit report. It falls around the middle of the certificate's 5 years.07/10/2026
Third-Party OrganizationThe Third-Party Organization that issued your TSMS certificate.Name on the TSMS certificate.ABC Marine Services

Vessel Audits

46 CFR 138.315(b) · Each audit (every boat at least once per certificate)

External audits of individual boats by your TPO. Each boat must be audited at least once during the 5-year TSMS certificate.

FieldWhat it isWhere to find itExample
External audit dateThe date the TPO auditor audited this boat.TPO vessel audit report.06/30/2027
AuditorThe auditor's name and company.Signature block of the audit report.R. Landry, ABC Marine
ResultWhat the audit found and whether findings are closed.Audit report. Put each finding in Findings with an owner and due date.Findings issued

Drydock & Hull

46 CFR 137.300 · Per the hull schedule (X3 works out the next due date)

Drydock and internal structural exams of the hull. Missing one can stop the boat from working and is checked at COI renewal.

FieldWhat it isWhere to find itExample
Salt waterWhether the boat works in salt water more than 6 months a year. Salt water means more frequent exams.Your operating area and trip history.More than 6 months in any 12
Last drydock examDate of the most recent drydock exam.Drydock or survey report, or the shipyard invoice.04/15/2026
Drydock exam before thatDate of the drydock exam before the last one.Older drydock report.05/20/2023
Last internal structural examDate of the last internal structural exam (inside the tanks, voids and hull).Survey report for the internal structural exam.04/15/2026
Next exam due (leave blank to work it out)When the next exam is due. Leave blank and X3 works it out.Only fill in if your TPO or the Coast Guard set a specific date.04/15/2029

Drills

46 CFR 140.420 / 142.245 · On your drill schedule (each topic for each crewmember)

Emergency drills and instruction held aboard. Every crewmember must take part in each type of drill, and drills must be recorded in the TVR.

FieldWhat it isWhere to find itExample
DrillThe type of drill.Pick the emergency practiced. Use Other for anything else.Man overboard
Date heldThe date the drill was held.Logbook or TVR entry for the drill.06/30/2027
Scenario and instruction givenWhat was practiced and what instruction was given.Drill sheet or logbook. Be specific: what happened, what crew did.Deckhand overboard off the tow
Crew who took partNames of the crew who took part.Drill sign-in sheet.J. Ruiz, T. Bell, M. Ortiz
Repeat every (days)Days between drills of this type.Your TSMS or drill schedule. 30 = monthly.30

Findings

46 CFR 138.220(a)(2)(ii) / 137.135 · Each time a finding is issued

Problems found by audits, surveys or the Coast Guard, with the fix and proof it worked. Auditors want to see each finding closed with evidence.

FieldWhat it isWhere to find itExample
FromWho found the problem.Audit or survey report heading, or the CG-835V for Coast Guard items.External audit
FindingThe problem, in the auditor's words.Copy it from the audit report, survey report or CG-835V.Fire drill not logged for May
Corrective actionWhat you will do to fix it and stop it happening again.Your corrective action plan.Add drill to monthly checklist
DueWhen the fix must be done.Date set by the auditor, TPO or Coast Guard, or your TSMS deadline.07/31/2027
How the fix was verifiedHow you proved the fix worked.E.g. reviewed next month's logbook, photo of repair, re-audit.Checked June TVR — drill logged
StatusWhere the finding stands. Close it only after it's checked.Fixed - awaiting check means someone still has to verify it.Open

Watch Log

46 CFR 15.705(d) / 140.400(c) · Every watch change

Who stood watch and when. Watch changes must be recorded in the Towing Vessel Record.

FieldWhat it isWhere to find itExample
RoleThe watch position the person stood.Watch schedule or logbook.Mate (Pilot)
Assumed watchWhen the person took over the watch.Logbook or TVR watch entry.06/30/2027 06:00
RelievedWhen the person was relieved.Logbook or TVR watch entry.06/30/2027 12:00

Towing Vessel Record

46 CFR 140.910 / 140.915 · Each time a required event happens

The Towing Vessel Record: the official log of required events. Missing or incomplete TVR entries are one of the most common towing deficiencies.

FieldWhat it isWhere to find itExample
Date & timeDate and time of the event.When it actually happened, not when it was written down.06/30/2027 08:15
EntryThe type of event being recorded.Pick the matching type. Every required TVR item is listed.Towing gear inspection
DetailsWhat happened, plainly and completely. Never overwrite an earlier entry; add a correction.From the crew's notes, checklist or logbook.Inspected main towline, no damage

Fire & Lifesaving Gear

46 CFR 142.240 / Part 141 · Monthly checks; yearly servicing by a servicing company

Inspections and servicing of fire-fighting and lifesaving gear. Expired or uninspected gear is a common inspection deficiency.

FieldWhat it isWhere to find itExample
EquipmentThe type of equipment.Pick the matching type.Portable extinguishers
Unit no. / IDSerial number or your own tag number for this item.Stamped on the item, its data plate or service tag.EXT-04
Last inspected / testedThe date of the last inspection or test.Inspection tag on the item, or the servicing company's report.06/30/2027
By (crew, servicing company)Who did it: a crewmember for monthly checks, or the servicing company for yearly service.Initials on the tag or the company named on the service report.Gulf Fire & Safety
ResultOK, or Defect found. Put any defect on Defects & Work Orders too.The inspection result.OK
Repeat every (days — 30 for the monthly NFPA 10 check)Days between inspections. 30 for the monthly extinguisher check.Maker's instructions or your TSMS.30

Crew Orientation

46 CFR 140.410 · Each new crewmember on each boat

The safety orientation each new crewmember gets before working aboard. It must be recorded in the TVR.

FieldWhat it isWhere to find itExample
Safety orientation givenThe date the safety orientation was given.Orientation checklist signed by the crewmember, or the TVR entry.06/30/2027
Given byWho gave the orientation.Name on the signed orientation checklist. Usually the master or mate.Capt. R. Landry

Health & Safety Plan Training

46 CFR 140.515 · Within 5 days of employment, then yearly

Health & safety training for each crewmember: within 5 days of starting, then a yearly refresher.

FieldWhat it isWhere to find itExample
Hired or joined the companyThe day they started.Personnel file.09/01/2026
Health & safety plan training completedThe day they finished health & safety training.Sign-in sheet or certificate.09/03/2026

Hazard Register

46 CFR 140.505 / 140.510 · Review every year and after any injury

Your list of health and safety hazards on each boat and how you control them — engineering controls before PPE.

FieldWhat it isWhere to find itExample
Last reviewedWhen this hazard was last reviewed.Your safety meeting minutes.07/10/2026

Towing Gear

46 CFR 140.820 / 33 CFR 164.76 · On your TSMS schedule

Inspections of towlines, face wires and other towing gear. Worn or uninspected gear can part under load and is checked by TPOs and the Coast Guard.

FieldWhat it isWhere to find itExample
Towline, face wire or spring lineThe towline or wire inspected, with its ID if it has one.Towline record, tag on the line, or the maker's certificate.Main towline #2, 2-in. HMPE
ExaminedThe date the gear was examined.TVR towing gear entry or checklist.06/30/2027
Examined byWho examined it.Name in the TVR entry.T. Bell, Mate
Repeat every (days, per your TSMS)Days between examinations.Your TSMS or towline maker's guidance. 30 = monthly.30

Towline Register

33 CFR 164.74 / 46 CFR 140.820 · Inspect at least monthly

Every towline, its breaking strength and its monthly condition checks. If the condition record lapses 3 months, the line must be retested or removed.

FieldWhat it isWhere to find itExample
Minimum breaking strength (lbs)The line's minimum breaking strength when new, in pounds.Manufacturer's certificate or test report.250000
Last inspected (condition)Last visual condition inspection.Your towline log or vessel record.10/20/2026
Last retestLast tensile retest, if any.Class society or test lab certificate.02/14/2025

Pre-Underway Tests

46 CFR 140.615 / 33 CFR 164.80 · Before trips over 24 hours, and at each change of master

Tests of steering, signals, propulsion and navigation gear before getting underway. These are required before trips over 24 hours and when a new master takes over.

FieldWhat it isWhere to find itExample
TestedWhen the tests were done.TVR or logbook entry.06/30/2027 05:30
SteeringResult of the steering test (full rudder both ways, alarms, indicators).Pre-underway checklist.Pass
Whistle / signalsResult of the whistle and sound signal test.Pre-underway checklist.Pass
Propulsion controlResult of the propulsion control test (ahead and astern from each station).Pre-underway checklist.Pass
Towing gearResult of the towing gear check.Pre-underway checklist.Pass
Navigation lightsResult of the navigation lights check.Pre-underway checklist.Pass
Navigation equipmentResult of the navigation equipment check (radar, GPS, compass, AIS, swing meter).Pre-underway checklist.Pass
CommunicationsResult of the radio and internal communications check.Pre-underway checklist.Pass

Fuel & Oil Residue Log

46 CFR 140.915(a)(8) / 33 CFR 151.25 · Each fueling or waste offload

Fuel and lube oil taken on, and oily waste or bilge water landed ashore. Oily bilges are a leading cause of towing vessel detentions.

FieldWhat it isWhere to find itExample
Date & timeWhen the fueling or offload happened.Fuel delivery ticket or waste receipt.06/30/2027 10:00
EntryWhat was received or landed ashore.Fuel ticket for fuel; reception facility receipt for oily waste.Oily residue landed ashore
GallonsAmount in US gallons.Delivery ticket or waste receipt.450
Facility / supplierThe fuel supplier or waste reception facility.Name on the ticket or receipt.Riverbend Fuel Dock (sample)
Receipt no.The receipt or ticket number. Keep the paper.Top of the delivery ticket or waste receipt.BDN-55102

Defects & Work Orders

46 CFR 140.620 / 137.135 / 138.220 · Each time a defect is found

A list of everything broken or wrong on the boat, who is fixing it and by when. Inspectors and TPOs look for defects that were found, tracked and actually closed.

FieldWhat it isWhere to find itExample
SystemThe part of the boat the problem is in.Pick the closest match. Use Navigation equipment for radar, AIS, GPS, compass or radios.Steering
DefectA short, plain description of what is wrong.Copy it from the crew report, survey report, audit finding or CG-835V wording.Port steering ram leaking hydraulic oil
FoundThe date the problem was first noticed.Logbook or TVR entry, the crew report, or the survey or audit report date.06/30/2027
SeverityHow serious it is. Major = stop using the boat (or that system) until fixed.Use your SMS/TSMS definitions. Anything that could hurt someone or the boat right now is Major.Non-conformity
Affects navigation safetyYes if the problem affects safe navigation (steering, lights, radar, compass, radios).If Yes, the master must decide whether it is safe to continue and log that decision.Yes
Fix byThe date the repair must be done by.Your SMS/TSMS deadline, or the due date written on the CG-835V or audit finding.07/15/2027
Parts / vendorParts on order and the shop or vendor doing the work.Purchase order, vendor quote or work order.PO 4471 — Gulf Hydraulics
Repair madeWhat was actually done to fix it.Mechanic's work order or invoice, or the engineer's logbook entry.Replaced ram seals, tested OK
StatusWhere the repair stands. Only close it after someone has checked the fix works.Repaired — awaiting check means a second person still needs to verify it.Repaired — awaiting check

Planned Maintenance

46 CFR 138.220(c) / 199.190(b) · Each time a task is done

Routine maintenance that is due by calendar days or engine hours. A working maintenance plan is a required part of a TSMS or SMS, and auditors check that jobs were done on time.

FieldWhat it isWhere to find itExample
EquipmentThe machine or system the task is for.Name it the way it appears on the equipment list or maker's manual.Main engine — port
TaskThe maintenance job to do.Maker's manual service schedule or your TSMS/SMS maintenance list.Change lube oil and filters
Every (days)How many days between jobs. Leave blank if the job runs on engine hours only.Maker's manual or your maintenance plan. 30 = monthly, 90 = quarterly, 365 = yearly.90
Or every (running hours)How many running hours between jobs, if the task is hour-based.Maker's service interval in the engine or generator manual.500
Last doneThe date the task was last completed.Engineer's log, work order or the service record.06/30/2027
Running hours when doneThe hour-meter reading when the job was last done.Hour meter on the engine or control panel, written on the work order.12,450
Running hours nowToday's hour-meter reading. Update it regularly so X3 can tell when the next job is due.Read it off the engine hour meter or the engine room log.12,880

Safety Checks

46 CFR 185.728 / 199.190 / 176.810 / 142.240 / 180.68 · Weekly to monthly, depending on the check

Routine safety-gear checks such as EPIRB self-tests, extinguisher inspections and alarm tests. These are common items on a Coast Guard or TPO deficiency list.

FieldWhat it isWhere to find itExample
CheckWhich safety check was done.Pick the matching check. Use Other for anything not listed and describe it in notes.EPIRB monthly test
DoneThe date the check was done.Logbook entry, inspection tag initials, or the checklist sheet.06/30/2027
ResultOK, or Defect found if anything failed. A defect should also go on Defects & Work Orders.The person doing the check marks this on the spot.OK
Expires (flares, batteries)Expiry date for items that run out, such as flares or batteries.Printed on each flare, and on the label of EPIRB batteries and hydrostatic releases.11/30/2028
Repeat every (days — blank uses the usual interval)Days between checks. Leave blank to use the usual interval for this check.Only fill in if your SMS/TSMS sets a different interval. 7 = weekly, 30 = monthly.30

Surveys & Reports

46 CFR 137.200 / 137.205 / 2.01 · Each time a survey or inspection is done

A record of each survey, inspection or exam done on the boat, and what it found. This is your proof for the COI renewal and for the TPO.

FieldWhat it isWhere to find itExample
SurveyThe type of survey or inspection.Shown at the top of the survey report or on the Coast Guard inspection paperwork.Annual TPO survey
DateThe date the survey or inspection was done.First page of the survey report, or the date on the Coast Guard inspection record.06/30/2027
Surveyor / inspectorThe name of the surveyor or Coast Guard inspector.Signature block of the survey report, or the inspector named on the CG-835V.J. Thibodeaux
TPOThe Third-Party Organization the surveyor works for, if any.Letterhead of the survey report or your TSMS certificate.ABC Marine Services
Report no.The report or job number, so you can find the paper later.Top of the survey report. Coast Guard records may show an activity number.SR-2027-0412
Non-conformities foundHow many problems the survey found. Enter 0 if none.Count the findings listed in the survey report.2
Items to fix before serviceAnything the surveyor said must be fixed before the boat goes back to work.Look for 'prior to', 'before return to service' or out-of-service items in the report.Replace fire pump impeller

Internal Survey Program

46 CFR 137.202 / 137.210 / 137.215 · Every item at least every 12 months

Each item of your internal survey program and when it was last surveyed. TPOs are told to write a non-conformity when the program isn't tracked.

FieldWhat it isWhere to find itExample
Last surveyedThe date this item was last surveyed.Your internal survey report.04/12/2026
Surveyor (competent person)Who surveyed it — a competent person.The survey report signature.Port Engineer R. Lee
Part of the fifth-year surveyYes if this survey is part of the fifth-year survey before COI renewal.Your survey plan.Yes

Safety Walkdowns

46 CFR 137 / company program · Monthly, and before every survey

A walk-through of the boat using the checklist of items inspectors write up most. Fails become defects automatically.

FieldWhat it isWhere to find itExample
WalkedDate of the walkdown.Your checklist.10/25/2026

Compliance information, not legal advice. Rules cited are current as we publish; confirm against the official eCFR.